Helicopter night vision goggle program and request for OpSpec A050
OpSpec A050 + program · 14 CFR 91.205(h), 61.31(k), 61.57(f)
When you need it
NVG ops
What the FAA does with it
The FAA issues OpSpecs A050 and D093, submitted by You send it to your principal inspector or Flight Standards office; we give you step-by-step instructions.
What you'll need to provide
NVIS installation approval, approved goggle part numbers, your NVG procedures, weather minimums and training plan
What the FSDO looks for
Inspectors evaluate submissions using FAA Order 8900.1 guidance and, for certificate holders, SAS Data Collection Tools.
- 8900.1: V3 C18 S3 Part A Operations Specifications: General (CHG 1021, Current) | V4 C7 S4 Night Vision Imaging Systems (CHG 939, Current) | V4 C6 S6 Safety Assurance System: Night Vision Imaging Systems (CHG 492, Current) | V6 C11 S22 Conduct Night Vision Imaging System Evaluation Inspection (CHG 1033, Current)
- Advisory Circulars: AC 135-14B
- DCTs: ED_2.1.1_B_OP_V55.0; ED_2.1.1_C_OP_V54.0; ED_2.1.1_E_OP_V53.0; EP_2.1.1_B_OP_V51.0; EP_2.1.1_C_OP_V51.0; EP_2.1.1_E_OP_V51.0; ED_4.6.1_B_AW_V35.0; ED_4.6.1_B_AW_V39.0; ED_4.6.1_C_AW_V34.0; ED_4.6.1_C_AW_V38.0; ED_4.6.1_E_AW_V34.0; ED_4.6.1_E_AW_V38.0; EP_4.6.1_B_AW_V36.0; EP_4.6.1_C_AW_V34.0; EP_4.6.1_D_AW_V28.0; EP_4.6.1_D_AW_V31.0; EP_4.6.1_E_AW_V31.0; EP_4.6.1_E_AW_V35.0
Common reasons submissions are returned
- Aircraft data (make, model, serial, N-number) inconsistent across the application, the document and the registration certificate
- Outdated revision of a referenced AC, MMEL or template
- Missing signatures, dates or revision control on each page
- Missing required attachments: NVIS installation approval, approved goggle part numbers, your NVG procedures, weather minimums and training plan
- Submitting to the wrong office or by the wrong method (expected: You send it to your principal inspector or Flight Standards office; we give you step-by-step instructions)
General issues drawn from the requirements above, not statistics.
Get it done for you
Flat fee $1,625. You see your order total before you pay anything, and your specialist gives you a delivery date. We prepare it, you review a proof, then you pay the balance. No hourly billing.
Get this done for me See all prices
Sources: the regulations, ACs and 8900.1 sections listed above (public FAA documents). Guides explain requirements; they are not the document and not legal advice.
BizJetDocs is not affiliated with or endorsed by the FAA. Not legal advice. We cannot guarantee FAA acceptance or approval. You are responsible for the accuracy of your answers and for submitting to the FAA. Liability is limited as set out in the Terms.