← Guides

Request for OpSpec A160, rotorcraft operations without a radio altimeter

OpSpec A160 · 14 CFR 135.160(b)

When you need it

Rotorcraft LODA ops

What the FAA does with it

The FAA issues or denies OpSpec A160, submitted by You send it to your Flight Standards office at least 60 days before operations; we give you step-by-step instructions.

What you'll need to provide

Each rotorcraft (2,950 pounds or less), panel photographs and the installer's statement on why a radio altimeter cannot be fitted

What the FSDO looks for

Inspectors evaluate submissions using FAA Order 8900.1 guidance and, for certificate holders, SAS Data Collection Tools.

Common reasons submissions are returned

General issues drawn from the requirements above, not statistics.

Get it done for you

Flat fee $350. You see your order total before you pay anything, and your specialist gives you a delivery date. We prepare it, you review a proof, then you pay the balance. No hourly billing.

Get this done for me See all prices

Sources: the regulations, ACs and 8900.1 sections listed above (public FAA documents). Guides explain requirements; they are not the document and not legal advice.

Get started

BizJetDocs is not affiliated with or endorsed by the FAA. Not legal advice. We cannot guarantee FAA acceptance or approval. You are responsible for the accuracy of your answers and for submitting to the FAA. Liability is limited as set out in the Terms.